
I worked for Brian Healy Architects from 1995-1998, while attending the GSD. This project was never realized. These drawing were part of the construction documentation, and were a result of my calculations and hand.



research education projects
I worked for Brian Healy Architects from 1995-1998, while attending the GSD. This project was never realized. These drawing were part of the construction documentation, and were a result of my calculations and hand.
Leave a Reply